Graphical Job Schedule
Objective
To provide a visual
representation of the production schedule and allow drag-and-drop
manipulation to enhance factory production
The Value of SYSPRO
Graphical Job Schedule
- Presents a graphical view of the
utilization of each work center by job and day
- Effectively monitor each job and
identify potential problem areas before they become obstacles
- View Available to Promise (ATP)
graphically
- Highlights overloads as well as
underloads
- Demand pegging and supply chain
operation available "at a glance" with the ability to
update shipping or due dates
- View and control multiple
constraints in the production schedule
- The effect of queue time, elapsed
time, move time and routing on dates and capacity loadings is
apparent, user can review routing procedures
- Work Center Capacity Calendar is
visible in its entirety and can be easily manipulated
- Permits complete reload of each job
on a forward or backward basis
- Preview of reports to screen and
e-mail capabilities
- "At a glance" job status
regarding material allocations and operations
- Supports "backflush"
environments that operate a JIT/Kan Ban production system
Matching SYSPRO to your
business
- Real-time, on-line scheduling
information that reflects the shop floor demand
- Easily manipulate the schedule using
a simple to use drag-and-drop process
- Graphically presents a schedule for
review
- Gives a more concise tactical view
of production schedules and workloads by day and by job
graphically
- View production schedule by work
center, or by the job
- Job conflicts become readily
apparent
- Choose how many productive units
should be scheduled during the job and how much overtime is
permitted
- Drag-and-drop scheduling with WIP
updated in real-time
- Manipulate operation capacity
loading using smoothing, forward or backward loading functions
- Analyze the Work Center Capacity
Calendar including working days, capacity hours, available
productive units and overtime potential
- Modify the operation planned fi nish
date, move time and queue buffer
- Adjust both consecutive and
concurrent operation/routings
- Determine if the job planned start
date can be started earlier, delayed or compressed to meet the due
date
- Analyze the potential for using an
alternate work center or subcontractor to complete the task
Integration
- Graphical Job Schedule for SYSPRO
integrates and is required with the Work in Progress module