Advanced Planning and Scheduling (APS)     Engineering Change Control     Factory Documentation     Graphical Job Schedule    
Materials Yield System     Net Requirements Planning     Projects & Contracts     Work in Progress


Bill of Materials

Objective

To define the relationship between a manufactured item and its component materials as well as the sequence of operations required to produce the item, facilitating an accurate expected cost against which to track actual production costs.

The Value of SYSPRO Bill of Materials

  • Maintain up to 15 levels of component and sub-component items

  • Detailed screen query showing costing information and operational Gantt Charts

  • Multi-level trial kitting identifies material shortages

  • Standard and "what-if" costing queries and analysis with comparison to current costs

  • Supports planning bills, phantom parts and sub-contract operations

  • Optional components supported for sales of kits

  • Track component level of effectivity dates

  • Define scrap factors for more accurate planning

  • Drag-and-drop facility in Bill of Material maintenance

  • Multiple tree-view structures

Matching SYSPRO to your business

  • Multiple recovery rates are available per cost center, work center and employee (to calculate overtime, time and a half, shift differentials, etc.)

  • Define different units of measure (hours, minutes, seconds) for tracking time and   capacity

  • Define component requirements up to 6 decimal places

  • Extensive user-defined notes

  • Multimedia ability to link pictures and videos to BOM

  • Support multiple alternate routes

  • Validates structures and operations and provides notification of potential problems

  • Calculates expected labor and material costs

  • Calculates manufacturing lead times

  • Easy, automated "Where-Used Display" and "Replace Where-Used" function

  • Import structure and routings from CAD or third-party systems

  • Analysis of elapsed time and available capacity

  • Calculates dynamic-elapsed time and capacity required

  • Instant on-screen access to BOM details

  • Transfer calculated BOM cost to unit cost of item

  • Indicate move time between work centers

  • Work center and productive unit capacity calendar

  • Define components as quantity per, percent of parent or specific quantity regardless of batch

Audit Trails and Reporting

  • User-defined selection criteria for flexible reporting
  • Detailed reporting on where materials are used
  • Full Bill of Material costing reports
  • Reports complete routing information
  • Trial kitting list highlights quantity requirements and shortages
  • Listings of manufactured parts with and without a structure attached
  • Various BOM profiles provided

Integration

  • Integrates with the Inventory Control, Product Configurator, Work in Progress, Sales Orders & Invoicing, Requirements Planning and Quotations and Estimating modules
  • Activity Based Costing accumulates and applies different cost elements at the time they are accrued
  • Email reports with the Office Automation module
  • Bill of Materials requires the Inventory Control module

 

© 2002 Syspro. All Rights Reserved. All trademarks are recognized.

 

Home | Products | Partners | Services | Support | About Us | Contact Us
© 2003 Lonehill Systems, Inc.
Customer Service